Skip to main content

Project Capability

Power Factor Correction System

Baladi Poultry Company Project

Installation of three 700 kVAR power factor correction panels, power analysis, electrical design, manufacturing, installation, testing, and commissioning.

Client
Baladi Poultry Company

Scope of Work

Power Factor Correction System - Installation of 3 PFC panels (700 kVAR each) - Power analyzer installation and network study - Electrical design and capacitor system optimization - Manufacturing, supply, and installation - Final testing and commissioning

Detailed Description

The project covered a complete power factor correction system for Baladi Poultry Company. The work included three 700 kVAR PFC panels, power analysis and network study, electrical design and capacitor system optimization, manufacturing, supply, installation, final testing, and commissioning.

Project Gallery

View the complete set of published images for this Project.

Request a quotation

Share your requirements through the quotation form.

Request a quotation