Project Capability
Power Factor Correction System
Baladi Poultry Company Project
Installation of three 700 kVAR power factor correction panels, power analysis, electrical design, manufacturing, installation, testing, and commissioning.
- Client
- Baladi Poultry Company
Scope of Work
Power Factor Correction System - Installation of 3 PFC panels (700 kVAR each) - Power analyzer installation and network study - Electrical design and capacitor system optimization - Manufacturing, supply, and installation - Final testing and commissioning
Detailed Description
The project covered a complete power factor correction system for Baladi Poultry Company. The work included three 700 kVAR PFC panels, power analysis and network study, electrical design and capacitor system optimization, manufacturing, supply, installation, final testing, and commissioning.
Project Gallery
View the complete set of published images for this Project.
Request a quotation
Share your requirements through the quotation form.